Long-duration energy storage (LDES)

Storage that can hold electricity and release it for many hours or days, helping cover long periods of low wind and sun. Ofgem's scheme defines it as eight hours or more.

By Eugene SerbinUpdated

Long-duration energy storage (LDES) covers technologies that can store electricity and release it over many hours or even days. Ofgem’s support scheme defines long-duration electricity storage as at least eight hours of output at full power. Most grid batteries built so far discharge for two to four hours.

Why it matters

A grid that runs mainly on wind and solar needs to cover still, cloudy spells that can last for days, and to use surplus power that would otherwise be curtailed. Short-duration batteries help within a day; LDES shifts larger volumes of energy over longer periods and could reduce reliance on gas plants as backup. No new large-scale long-duration storage has been commissioned in Great Britain for decades, largely because the projects are expensive and their future revenues uncertain.

Technologies

Technology How it stores energy
Pumped storage hydro Pumps water uphill to a reservoir, releases it through turbines
Compressed air Stores air under pressure, often in underground caverns
Liquid air Cools air until it liquefies, then expands it to drive a turbine
Flow batteries Pumps liquid electrolytes, such as vanadium, through a cell
Long-duration lithium-ion Standard battery cells sized for eight hours or more

Ofgem’s cap and floor scheme

The government confirmed in 2024 that it would support LDES through a cap and floor scheme run by Ofgem. If a project’s revenues fall below a floor, consumers top them up through bills; revenues above a cap are shared back with consumers. The first application window ran from April to June 2025.

On 26 June 2026 Ofgem published its minded-to decision for window 1, provisionally selecting 16 projects with about 7.65 GW of power and 136.9 GWh of storage, with durations of 8 to 22 hours. They comprise 11 lithium-ion battery projects, 3 pumped storage hydro schemes, 1 compressed air project and 1 vanadium flow battery. The consultation closed in August 2026. As of early October 2026, Ofgem had not published final decisions, which it expects in autumn 2026.

Read more: Pumped storage hydropower: the UK’s biggest battery.